OPENING Q2 2026 — The 2,100 sqm Harare facility exists and is in use by the Mazano team. Infrastructure resilience upgrades (22kW solar + Starlink) are underway ahead of Cohort 1. Support the upgrade →
A 2,100 sqm Harare Facility Being Upgraded for Cohort 1
Our Harare building is real, functioning, and ready for founders. Grant funding is powering the infrastructure upgrades — 22kW off-grid solar and Starlink satellite internet — that will make it fully resilient before the Next Step Bootcamp Cohort 1 launches in Q2 2026.
Starlink Internet UPGRADE IN PROGRESS
The facility currently runs on fiber internet. Grant funding will enable the upgrade to dual Starlink Business kits with mesh Wi-Fi covering every zone — removing dependency on local ISPs entirely.
Off-Grid Solar
The facility has a modest existing solar setup and grid power. The planned upgrade — 22kW peak solar with 88kWh lithium battery storage — will run the full facility for 8-10 hours without sun and eliminate grid dependency entirely.
Full Kitchen
Commercial-grade kitchen with 6-burner stove, double-door fridge, communal dining, and solar water heating — already in place and in use. Fuel your team, not just your business.
Space Zones — 2,100 sq m
Open Co-Working
Hot desks, standing desks, casual seating
Flex Space
Workshops, events, Demo Day, overflow
Manufacturing Lab
Prototyping, 3D printing, light manufacturing
Private Offices
4-6 lockable offices for resident startups
Conference Rooms
8-seat + 16-seat with full AV equipment
Kitchen & Dining
Full commercial kitchen, communal meals
Guest Rooms
Furnished rooms for visiting mentors & partners
Outdoor & Common
Courtyard, parking, signage, breakout area
Why This Matters
The Problem
- 01 Zimbabwe averages 18+ hours of power cuts daily in some areas. Businesses can't operate.
- 02 Broadband is expensive, slow, and unreliable. Entrepreneurs can't access global markets.
- 03 Professional workspace is scarce and unaffordable for early-stage founders.
- 04 Long work hours with no access to meals or basic amenities reduce productivity.
Our Solution
- 01 Planned upgrade: 22kW off-grid solar with 88kWh battery storage — replacing the existing modest solar to eliminate grid reliance.
- 02 Planned upgrade: Dual Starlink satellite dishes with mesh Wi-Fi — replacing the current fiber link for true infrastructure independence.
- 03 Already in place: Borehole water supply — fully independent of municipal supply.
- 03 2,100 sq meters of purpose-built workspace across co-working, offices, and flex space.
- 04 Full commercial kitchen feeding entrepreneurs so they can focus on building.
Infrastructure Specs
Off-Grid Energy System
- 40x 550W monocrystalline panels
- 2x 10kW hybrid inverters
- 4x 48V 200Ah lithium batteries
- Lightning protection & earthing
- 8-10 hrs full operation without sun
Starlink Satellite Internet PLANNED
- 2x Starlink Business kits
- Mesh Wi-Fi full building coverage
- CAT6 ethernet to every desk
- 48-port managed network switches
- UPS backup for network gear
Full Commercial Kitchen
- 6-burner commercial gas stove
- Double-door commercial fridge
- Solar water heating system
- Water purification system
- Communal dining for 20+ people
The Space
Setup Timeline
Planning
Nov 2026
Floor plans, procurement, contractor bids
Renovation
Dec 2026 – Jan 2027
Building work, electrical, plumbing, painting
Infrastructure
Jan – Feb 2027
Solar install, Starlink setup, kitchen fit-out
Furnishing
Feb 2027
Desks, AV equipment, security, guest rooms
Launch
Mar 15, 2027
Testing, soft launch, grand opening event